Electric installations

ground communication station Aflenz (click into the picture for enlargement)Heating systems

Satellite radio station in Aflenz:

Two satellite dishes with 35m diameter each. Our technicians renovated and improved the heating system of the dishes. 900 square meters of heating surface produce an amount of 800kW heating-power. This measure avoids a snow lining on the dishes. The complexity of the installation to amount to 2x 3month for 3-4men as well as the coordination of a secondary company with also 4men.

Systems for emergency power supply (UPS)Emergency power supply (click into the picture for enlargement)

Priority TelecomOn behalf of UPC-Telekabel engineer Witke is building the complete emergency power supply for Priority Telecom in the area of Vienna.

Since the telephone network may not be concerned because of conventional power failures, the Priority network must be supplied with 65 volt in case of power failures. In over 305 different places in Vienna such UPS (Uninterruptible Power Supply) systems provide an independent emergency power supply for approx. 6 hours.


USV-Trailer (click into the picture for enlargement)With our equipment we can ensure a continuous power supply even under hardest conditions.

This USV-trailer is equipped with a generator, in order to take over the power supply during the work.

 
Design © Space-Factory
 
| Impressum | Sitemap | Sitesearch | top | back |
Logo
Ing. Witke Ges.m.b.H.
Simmeringer Hauptstr. 257
A - 1110 Vienna
Phone: +43 1 76 98 350
Fax: +43 1 76 98 748
Mail: office@witke.com
Mo. - Th. 08:00 - 12:00
Mo. - Th. 13:00 - 17:00
Friday 08:00 - 13:15
Logo